Home
About Mercon
Recent events
Reference
Buildings
Petrol station
Factory unit
Waste water treatment plant
Přehled realizací (en-GB)
Contacts
MERCON - Wholesale division
MERCON - Implementation division
Search
Register
Login
Jste zde:
Reference
Přehled realizací (en-GB)
Astron (en-GB)
Astron
ASTRON Buildings a.s.
Supply and installation of new Allen Bradley control system for Astron Buildings a.s. production hall heating system was carried out in 2011. Hall measuring approximately 120 x 100 m is divided into several sections, which are heated by hot air units fitted throughout the hall area. Temperature sensors are fitted at selected locations, which switch on demand the heating units in different sections via the control system. The whole system is controlled and monitored from the hall main control room.
Layout of equipment within the hall
Copyright 2021 by KD Software, s.r.o.